Skip to content
Algiers 24°C
Advertisement

Algeria

Public Works Ministry Examines Key Rail Corridor Preparations

Preparations for the 495 km Laghouat-Ghardaïa-El Menia railway line are advancing, representing a key component of Algeria's extensive North-South corridor. This infrastructure initiative, supported by international partners, is poised to enhance national connectivity and economic development across the traversed…

Public Works Ministry Examines Key Rail Corridor Preparations

The realization of the Laghouat-Ghardaïa-El Menia railway line is progressing, marking a new preparatory stage for this 495 km section. This critical infrastructure project, forming part of the broader Alger-Tamanrasset corridor, recently saw the Minister of Public Works and Basic Infrastructure, Abdelkader Djellaoui, convene with a delegation from the African Development Bank (AfDB) in Algiers. The discussions focused on the launch preparations for the project, which is financed through a partnership involving the AfDB and the Asian Infrastructure Investment Bank (AIIB).

The meeting, held at the ministry's headquarters, addressed strengthening cooperation between Algeria and the AfDB, particularly concerning investment and infrastructure financing for railway network development. It included representatives from the National Agency for Studies and Monitoring of Railway Investments (Anesrif) and the Ministry of Finance. Discussions also encompassed the state of preparations, technical and organizational aspects, and the equipment, capabilities, and resources mobilized. Participants reviewed the master plan for railway material maintenance centers along the corridor, a vital component for operational continuity and equipment longevity.

Beyond its 495 km, the Laghouat-Ghardaïa-El Menia line is integral to the national railway program, constituting a segment of the 2,006 km North-South railway axis connecting Alger to Tamanrasset. This infrastructure is set to enhance territorial connectivity, improve population mobility, and foster economic exchanges between the country's North and South, valorizing the potential of the traversed regions through facilitated transport of passengers and goods. The Minister of Vocational Training and Education, Nacima Arhab, also participated, addressing the crucial need for qualified competencies. Discussions included adapting vocational training programs to railway project requirements, identifying essential trades, and anticipating skilled labor needs. The AfDB delegation commended the level of preparations and the efforts to integrate training and employment aspects into the project's realization, with continued coordination between the Ministry of Public Works and Basic Infrastructure and the AfDB emphasized.

Comments

Moderated before publication
ANEP Régie Publicitaireالصفقات العمومية