Skip to content
Algiers 24°C
Advertisement

Algeria

Merad Announces International Legal Action Against Border Pollution

Algeria will pursue national and international legal action concerning pollution originating from Morocco, which has affected Oued Mouilah and the Hammam Boughrara Dam in Tlemcen with heavy metals and pharmaceutical residues.

Merad Announces International Legal Action Against Border Pollution

Algeria will pursue national and international legal action regarding pollution originating from Morocco, affecting Oued Mouilah, the primary watercourse feeding Hammam Boughrara Dam in Tlemcen. This was announced by State Minister and Interior, Local Assemblies and Transport Minister Brahim Merad during a visit to the border district of Maghnia, undertaken on the instructions of President Abdelmadjid Tebboune. Laboratory analyses have detected heavy metals and pharmaceutical residues, along with other pollutants, at concentrations tens or hundreds of times above permissible limits.

Minister Merad described the degradation as an environmental crime, pledging to hold those responsible accountable and to pursue the case under relevant international environmental conventions. The contamination has caused the death of thousands of fish and extensive damage to the river’s ecosystem, with untreated domestic wastewater, industrial discharges, and agricultural runoff identified as suspected sources.

During his visit, accompanied by the ministers responsible for health, communication, environment, and hydraulics, Merad also examined measures to contain the pollution and safeguard the Hammam Boughrara Dam, a crucial water resource for the region. The response includes a multi-billion-dinar program focused on critical infrastructure.

Key projects under this program comprise expanding Maghnia’s wastewater treatment plant from 29,000 to 60,000 cubic metres per day, with a cost of DA 3 billion, and rehabilitating it for an additional DA 1.3 billion. Further initiatives include installing over 20 kilometres of pipelines to link urban wastewater discharges to the plant (DA 1 billion), establishing an industrial wastewater treatment facility at Oued Mouilah with a capacity of 1,750 cubic metres per day, and constructing a DA 250 million pumping station for the Ouled Mimoun industrial zone. A study identifying pollution sources upstream of the dam has been completed to guide short-, medium-, and long-term interventions.

Comments

Moderated before publication
ANEP Régie Publicitaireالصفقات العمومية