The Minister of Public Works and Infrastructure, Abdelkader Djellaoui, inspected on Monday evening the workshops of the Eastern Mining Railway Line project, specifically the section connecting Dreia and Oued Keberit in Souk Ahras province, covering a distance of 30 km.
After receiving detailed explanations regarding the progress rates, Djellaoui emphasized the necessity of delivering the project ahead of schedule. He also highlighted the importance of coordination with local authorities to accelerate the pace of work and ensure the mobilization of all human and material resources to respect contractual deadlines and address any field obstacles.
The Minister will continue his visit to the province on Tuesday by inspecting the railway section project connecting Bouchegouf and Dreia over a distance of 121 km.
As part of the same project, Djellaoui had previously inspected the progress of construction for two overpasses and two engineering structures located in the municipality of Houidjbet in Tebessa province.



